Music Release Asset Handoff: A Folder and Version-Control Template

A reliable release handoff identifies the exact approved files, the facts that belong with them, the person responsible for each decision and the changes made since the last delivery. Use one manifest as the index, keep different audio uses separate, and send each recipient only the current material they need. A folder named “final” is not enough to establish any of those things.

Download the blank folder structure and control files or the individual release manifest, change log and metadata and credits worksheet. The ZIP contains empty asset folders, instructions and blank CSV records; it contains no audio, photographs, credentials or fabricated approvals. The complete folder plan and a fictional version-change example are also shown below.

This is a team handoff method. It is not a universal distribution specification, a replacement for an order form or evidence that a release has passed platform review. Current source guidance was checked on 25 November 2026.

1. Define what is approved, and for which use

Begin with the recording and the intended delivery. Identify the release, track/version, intended recipient and purpose. An approved distribution master, an approved promotional copy and a working mix can all be valid files while serving different tasks. They should not compete under the same ambiguous label.

CD Baby’s release guide asks artists to prepare finished audio, metadata, producer/songwriter credits and artwork that follows the relevant distribution requirements. Use that as a preparation sequence, then record the actual requirements of your chosen distributor, engineer, publicist or service. It does not establish one audio format or artwork size for every destination. Source: preparing a single for distribution.

Give one person responsibility for maintaining the release record, and identify who can approve the audio, artwork, credits and campaign copy. One person may hold several roles on a small project. The useful distinction is the decision: technical export checks, artist approval and confirmation of contributor information need not be the same act.

An approval should identify the exact asset and scope. “Approved DemoArtist_PaperLantern_DistributionMaster_v03.wav for the selected distributor, subject to its current intake requirements” is more useful than “sounds good.” Retain the real message or approval record and its date. The filename here is a fictional example, not an audio file included in this template.

  • Record the actual filename or destination link, version and intended use.
  • Record who approved that item, when, and where the evidence is kept.
  • Record the current recipient requirement or specification used for the check.
  • Mark a missing decision as Review or Blocked, with an owner and reason.
  • Keep delivered/accepted/live status separate from internal approval.

Do not mark a whole release approved because the audio is ready. A credit correction, unconfirmed artwork permission or unresolved release date can still block a particular delivery. Equally, a missing optional social clip does not necessarily block a mastering handoff. Define the essential assets for that recipient rather than treating every folder as mandatory.

2. Use a small folder structure with an obvious starting point

Place the manifest in 00_RELEASE_CONTROL and make it the first file a teammate reads. The numbered folders below organise working responsibility and delivery purpose; they are an original portable example. Rename or remove categories that do not fit your release. The internal archive is kept for history, not offered as another set of current choices.

FolderPurpose
00_RELEASE_CONTROLManifest, change log, current requirements and handoff record
01_AUDIO_DISTRIBUTIONThe exact approved distribution deliverables for the selected recipient
02_AUDIO_PROMOApproved listening or promotional copies, labelled by use/version
03_ARTWORKApproved release artwork and recipient-specific exports
04_METADATA_CREDITSRelease facts, track facts and verified contributor information
05_PRESSApproved biographies, photographs, captions and permission notes
06_SOCIALApproved campaign visuals/video/copy, named by intended use
07_LINKSListening, release and campaign link register with access-test notes
99_ARCHIVE_INTERNALSuperseded files/history; keep outside external recipient shares by default

The Recording Academy’s Producers & Engineers Wing provides separate folder-hierarchy and naming recommendations for recording projects. Its guidance treats understandable names and organised folders as complementary and allows project-specific additions. This lighter handoff structure applies the same organisational principle to a small release team; it is not a reproduction of the Academy’s full production archive. Source: folder hierarchy and naming recommendations.

Keep editable source projects and production sessions in the appropriate internal archive when the recipient only needs exported deliverables. A mastering engineer may need different source material from a journalist or a social editor. Make the requested package explicit; do not send all internal production files by default or expect the recipient to infer which export to use.

Maintain the authoritative working copy in the team’s chosen storage, with a named owner. If you send a ZIP snapshot, label its version and date and retain the manifest that went with it. A shared folder can change after it is sent; a snapshot can become stale. Both methods work better when the recipient can tell exactly which state was handed over.

3. Name files by content, use and version

Choose a pattern that people can read without opening the file. This template uses Artist_Release_AssetRole_vNN.extension. Add an edit or track identifier where necessary. If you include a date, use an unambiguous year-first form and define whether it means creation or approval; do not let one filename imply several dates.

Teaching filenameWhat it identifiesWhat still needs checking
DemoArtist_PaperLantern_DistributionMaster_v03.wavThe third named distribution-master versionActual audio specification and approval for the intended delivery
DemoArtist_PaperLantern_PromoPreview_v02.mp3A separate promotional listening copyWhich approved master it derives from and whether this recipient accepts it
DemoArtist_PaperLantern_Cover_v02.jpgThe second named cover exportActual dimensions, credits, permissions and destination requirements
DemoArtist_PaperLantern_Metadata_v04.csvThe fourth revision of release factsWhich fields changed, whether they are approved and whether already delivered copies need correction

These extensions illustrate distinct roles; they are not prescribed formats. Changing a filename extension does not create a valid conversion. Keep the approved source and make any requested derivative through the appropriate export process, then open or play the output and verify that it is the correct version.

A promotional MP3 should not silently replace the distribution master. If the recipient accepts an MP3 for listening, record it as a derivative with its own purpose and a reference to the approved source. If a clean edit, instrumental or alternate master is required, label that exact version and verify its content rather than relying on a similar title.

Avoid using “final,” “latest” or “approved” as the only identity. Approval is a recorded decision that can change; the versioned filename identifies the object that was reviewed. An optional checksum can help compare whether two copies are identical, but it does not establish creative approval, rights or compliance with a recipient’s requirements.

4. Maintain metadata and credits alongside the files

The metadata worksheet separates release-level facts from track-level facts, credits, links and handoff administration. Complete it from information confirmed by the relevant people. Copy approved values into the destination’s actual fields and check the saved submission; do not assume a CSV used internally is a supported bulk-upload format.

GroupUseful fieldsReview question
ReleaseArtist display name, release title/type, intended date, status of that dateDo all team materials use the same current facts?
TrackTrack/version title, order, duration, language, content advisory, recording identifier if assignedDoes this row describe the exact audio supplied?
ContributorsPerformer, writer/composer, producer, mixer and mastering credits as applicableHave names, roles and spelling been confirmed?
Rights and permissions recordResponsible party and location of relevant approval/permission evidenceIs any required decision unresolved?
Destination mappingRecipient, current requirement reference, field/export mapping and submitted versionWhat has actually been delivered to this particular destination?
Links and datesExact approved URLs, access scope, intended date, confirmed delivery/live stateWhich value is planned, and which has evidence of completion?

Record an identifier only when it has actually been assigned and you know what it refers to. Do not create plausible ISRC or release-code strings to make a worksheet look complete. If the chosen distributor will assign an identifier, record that dependency and fill it in from the real returned information.

Keep private contributor agreements and sensitive business records separate from the general press package. The manifest can reference the controlled evidence location and its owner without distributing the underlying document to every collaborator. A public press credit and an internal permission record serve different purposes.

Check platform scope when correcting metadata. SoundCloud’s current track-editing guide says edits made through its track editor update SoundCloud and do not change releases already sent to other streaming services. A correction in that editor is therefore not proof that the same credit or title has changed on Spotify, Apple Music or another destination. Source: the scope of SoundCloud track edits.

For an already delivered release, use the relevant distributor or service’s correction process and record its response. Do not re-upload a release or substitute an active order’s destination link simply to align it with the local worksheet. Track the required correction, affected recipients and actual confirmation separately.

5. Label press, social and listening assets for their recipient

Each recipient should get a short index of what they need to use. A press package may contain a biography, images, captions and a listening link; a social editor may need approved crops, video versions and copy. Bandzoogle’s EPK guide explicitly distinguishes media, curator and other recipient types, which supports adapting the view of the package to the job. Source: different EPK recipient types.

For photographs and artwork, record the exact filename, creator credit and approved use notes next to the download. For video, record the intended use and version. For copy, keep the approved language and revision. A file being present in a folder does not mean every collaborator may publish it in every context.

For listening or campaign links, record the full URL, the object it opens, access conditions, who checked it and when. Test the route from outside the owner’s editing session. If it is private, make sure the chosen access method suits the intended recipient; do not include private preview links in a public package without considering who can open them.

Use the selected service’s current specification as the controlling reference for size, format, duration and required material. Save the URL or received specification and the date you checked it. A visually attractive export may be unsuitable for an intake form, and a technically accepted file can still be the wrong creative version.

6. Use the manifest and change log together

The manifest answers “Which item is current, for which use, and with what approval?” The change log answers “What changed, why, who authorised it, and who needs to know?” Keep one row per asset/version in the manifest when history matters. Mark the old row Superseded instead of erasing the evidence that it existed.

The downloadable manifest has 15 fields: asset ID, role, filename/URL, version, derived-from or supersedes reference, intended recipient, current requirement reference, owner, approval status, approver, approval time, evidence reference, delivery status, recipient acknowledgement and notes. It starts with 12 suggested asset roles at Draft; all approval and delivery fields are blank.

The change log provides 20 empty records with space for the old and new versions, reason, approver/evidence, affected recipients, actual notification and acknowledgement, owner and status. It records actions after they happen. A note saying “tell the publicist” should not be mistaken for evidence that the publicist received the change.

Fictional example: a ready master with an unresolved date

All names, filenames, dates and approval references in this example are fictional teaching data. No audio was produced, no person approved a real release and no recipient was notified. The example shows how to avoid declaring a whole package ready when one essential decision remains open.

Asset / versionPurpose and sourceInternal stateDelivery state
A01 · DistributionMaster_v03.wavDistribution export; supersedes v02Approved in fictional record DEMO-AP01Not delivered
A02 · PromoPreview_v02.mp3Listening copy derived from master v03Approved for the fictional listening useNot delivered
A03 · Cover_v02.jpgCurrent cover; supersedes v01Approved in fictional record DEMO-AP02Not delivered
A04 · Metadata_v04.csvProposed date changes from 14 to 21 May 2027Review: date approval still pendingBlocked for date-dependent handoff

The correct next step is to resolve the date before delivering a package that depends on it. The approved master does not lose its identity because the schedule is under review; the team should avoid presenting the proposed date as confirmed or sending mixed dates to different recipients.

ChangeRecordNext action and completion evidence
C01: master v02 → v03Fictional approval DEMO-AP01; promo preview recreated from v03Mark v02 Superseded; confirm the preview derives from v03 before any delivery
C02: proposed date 14 → 21 May 2027Metadata v04 is Review; no final schedule approval existsNamed owner obtains a decision; notify affected recipients only after the approved change and record actual acknowledgement

Once the date is actually agreed, add the evidence and update every affected current asset: metadata, press copy, scheduled creative and any campaign brief. If an earlier package was already sent, identify the exact correction in a concise change notice. Keep the old snapshot and the new one so the recipient can see what changed without guessing.

A useful change notice names the release, old package/version, new package/version, the changed fields or files, the required action and the contact for questions. Ask the recipient to confirm the specific update when that matters to delivery. A generic “updated the folder” message does not establish that their working copy changed.

7. Run a recipient handoff check

  1. Read the recipient’s current requirements and select only the necessary approved items.
  2. Open or play each selected deliverable; confirm the correct recording, edit, artwork and text.
  3. Compare filenames, dates, titles, credits and versions with the manifest and metadata sheet.
  4. Test access to the actual share link and downloads as an authorised outside recipient.
  5. Record the exact package/snapshot version, recipient, delivery time and items sent.
  6. Record acknowledgement and any requested correction separately from your own send action.

For a distributor, completing your folder is only preparation. CD Baby’s current submission guide separately requires completed payment and required information, chosen distribution options, signed agreements and the Submit for Distribution action. It says the release then enters an inspection queue. That is a concrete example of why internal approval, submission and accepted/live status must remain distinct. Source: finishing a CD Baby submission.

For mastering, promotion or another release service, use its own required review or moderation process. Do not copy another provider’s completion steps or assume that a successfully uploaded file has been accepted. The manifest should record the actual receipt, status or correction request you receive.

Before selecting a related task, compare your package with the current music release service requirements. If label outreach is part of the plan, use the separate record-label research guide to decide whom to approach. Keep this handoff package focused on exact files and decisions: one clear current version per intended use, a record of changes, and an accountable route for the next person to confirm receipt.

By AlwaysCompleted · Published